+30 210 6123452
info@ardeco.gr

Studies of Railroad Networks

SCOPE OF WORKS

All Track Works Studies

  • DFD (Walkways design, Concreted Tracks, Invert filling concrete, Elevated Boardwalks, Signs & Markers)
  • Track Alignment (horiz. & vertical)
  • Offset proof (tunnel/stations/depot sections)
  • Trackwork Installation (slab track, ballasted track, embedded track, special tracks)
  • Depot Special tracks (ballasted, embedded, on beams etc)
  • Embedded Networks (installation-routing) (PS, LV, TP, TC, TCS, Signalling, BACS, etc)
  • Drainage design
  • Stray Current Grid installation drawings
  • Turnout installation drawings
  • Coordination drawings
  • Special Designs (Transition Slabs, Buffer stop supports, Stinger supports, level crossings)
  • Floating Structures: Conceptual & Structural Analysis
  • 3rd rail Installation Design
  • Trackworks Work Instructions
  • Bill of Quantities
  • Participation in Tunnel & Track Monitoring Experts Team